S U M M A R Y


DIARY: April 6, 1997 01:03 PM Sunday; Rod Welch

Prepared Richmond subject index based on schedule.

1...Summary/Objective


..............
Click here to comment!

CONTACTS 

SUBJECTS
Richmond Project Launch, 97010304
Construction Launch Planning
WBS, SDS Subject Index
Activity Flow
Procedures Subject Indexing

1207 -    ..
1208 - Summary/Objective
1209 -
120901 - Follow up ref SDS 12 0000, ref SDS 11 0000.
120902 -
120903 - To do the subject index, we need to be able to breakdown the major
120904 - headings into dual bytes. This work resulted in changing the letters
120905 - of the WBS, but seems to permit using single character levels for the
120906 - major components.
120907 -
120908 -      [See review meeting with Tom on 970409, ref SDS 14 line 99, and
120909 -      application to COE report on Communication Metrics, ref SDS 15
120910 -      line 178.]
120911 -
120912 - Another thing I want to accomplish is make the WBS letters easier to
120913 - absorb by providing some consistency between organizational elements
120914 - for common activities.  For this reason I added a "Mobilize" level for
120915 - COE and put "Organiz" and "Facilities" under it, to correlate with AE
120916 - and GC contractor levels.
120917 -
120918 - A rule I am coming up with is to avoid double letters such as FFBC or
120919 - BCCF or BCFF.  I am not sure why this is a good rule except it may
120920 - imply some structure that is not intended.  It may be easier to
120921 - remember letters or to apply them if there are differences.  Of
120922 - course this causes difficulty in having consistency in use of letters
120923 - at comparable levels for comparable activities.  Actually, I wound up
120924 - abandoning this rule because it is impossible to follow in trying to
120925 - achieve consistency between WBS levels.
120926 -
120927 - Decided to swap the order of training or at least of listing the
120928 - training for inspection, safety, CCA and RMS.  CCA and RMS had been
120929 - shown first, as a foundation for inspection and safety.  I changed it
120930 - today because inspection and safety are the ultimate deliverables and
120931 - CCA and RMS are objectives and methods.  Eventually, Inspection
120932 - training should include CCA and RMS by definition, so these may fall
120933 - away.  Inspection is ahead of safety even though safety is a top
120934 - priority in the District, because inspection activity is the basis for
120935 - safety.
120936 -
120937 - Added to SI the term Quality Assurance as a supplement to Inspection.
120938 -
120939 -   BG...... Mobilize                    FB..... Mobilize
120940 -                                        FG B..... Plan
120941 -   BG BC..... Organize                  FG BC.... Mangement Plan (5b(1))
120942 -                                        FG BE.... QC Plan AE Work (5b(1))
120943 -                                        FG BH.... Safety Plan AE Work (5b(3))
120944 -                                        FG BI.... COE Approval Safety Plan (5b(3))
120945 -
120946 -   BG C...... Staff                     FG C..... Staff
120947 -                                        FG CB.... Personnel Resumes (5b(2))
120948 -   BG CD..... Project Engineer, Assign  FG CD.... PM Assignment Letter (8e)
120949 -                                        FG CE.... COE Approval Resumes 5b(2))
120950 -   BG CG..... Inspectors, Assign        FG CG.... Inspectors Assign
120951 -
120952 -   BG F...... Train COE Staff           FG F..... Train
120953 -   BG FC..... Inspection Training       FG FC.... Quality Assurance Training
120954 -   BG FE..... Safety Training           FG FE.... Safety Training
120955 -   BG FH..... CCA Guide Training        FG FH..... CCA Guide Training
120956 -   BG FK..... RMS Training              FG FK..... RMS Training
120957 -   BG J...... Facilities                FG J...... Facilities
120958 -   BG JC..... Project Office            FG JC..... Project Office
120959 -   BG JE..... Furnishings               FG JE..... Furnishings
120960 -   BG JG..... Telephone                 FG JG..... Telephone
120961 -   BG JK..... Equipment                 FG JK..... Equipment
120962 -   BG JM..... Configure Computers       FG JM..... Configure Computers
120963 -   BG JP..... Supplies                  FG JP..... Supplies
120964 -   BG JS..... Set Up Office             FG JS..... Set Up Office
120965 -
120966 -  ..
120967 - Objectives for WBS:
120968 -
120969 -     Stable
120970 -
120971 -        If activities are added, the identification of the remaining
120972 -        activities is not affected.
120973 -
120974 -     Flexible
120975 -
120976 -        Ability to add activities as new information arises and new
120977 -        circumstances occur.
120978 -
120979 -     Structure, Pattern Recognition
120980 -
120981 -        Common code elements should occur at the same place.
120982 -
120983 -     Short Strings
120984 -
120985 -
120986 - Made changes in activity description requested by Mike Murphy on
120987 - Friday, ref SDS 13 line 254.