Click here to comment!
1...3. We need the COE chart of accounts for tracking costs and/or
CONTACTS
SUBJECTS
Richmond Scope of Services, 970225
WBS, Subject Index
0604 - ..
0605 - Subject/Objective
0606 -
060601 - Followed up work at ref SDS 10 line 68, ref SDS 7 line 72, r
060602 - line 94, ref SDS 2 line 79.
060603 -
060604 - We need to upgrade the WBS for the launch schedule, per ref SDS 10 line
060605 - 115.
060606 -
060607 - Initially on 970326, ref SDS 8 line 148, we started with this:
060608 -
060609 - CB Planning
060610 - CH Budget
060611 - CK Project Team
060612 - CM Project Office
060613 - FB AE Contractor
060614 - HB Construction
060615 -
060616 - For some reason when I made the actual assignments in the
060617 - schedule, a lot of the assignments were single letter entries, and
060618 - this does not work well.
060619 -
060620 - One consideration is that this structure should fit into any existing
060621 - structure, as a sublevel. My perspective is also to develop a
060622 - structure that is conducive to the SI which likes two place levels.
060623 -
060624 - BC Planning
060625 - BCBC Objectives/Requirements
060626 - Plans & Specs, Engineering Report
060627 - PMP, PCA, CCA
060628 - BC0216 Schedule Project Launch
060629 - BC04 Organization
060630 - BC02BC COE Team
060631 -
060632 - Assign team leader for project launch and
060633 - develop staff needs for S&A site team.
060634 - Normally this should be the Construction
060635 - Manager, as the lead element, but could be
060636 - PM.
060637 -
060638 - BCDCDC AE Scope
060639 - BCDCFC Sponsor Role
060640 - BCFC Methods
060641 - BCFCBC Construction Management Plan
060642 - BCFCFC RMS Implementation
060643 - BCFCHC COE S&A Plan Ready
060644 - BF Budget
060645 - BFBC Develop Requirements
060646 - BFDC Sponsor Approval
060647 - BFFC Funding Authority
060648 - BJ CO Team S&A
060649 - BJBC Assign
060650 - BJBCBC Project Engineer
060651 - BJBCGC Inspectors
060652 - BJDC Train, Review
060653 - BJDCBC CCA Guide, CMP
060654 - BJDCFC RMS
060655 - BJDCJC Inspection
060656 - BJDCMC Safety
060657 - BM Project Office
060658 - BM Project Office
060659 - DC AE Contractor
060660 - GC Construction
060661 -
060662 - I am not happy with this WBS numbering sequence.
060663 -
060664 - What research is available to guide preparation of a WBS?
060665 -
060666 - 1. Work at ref SDS 1 line 121 calls for identifying specific
060667 - deliverables, which we seem to be doing.
060668 -
060669 - 2. We need to define Port of Richmond as a stakeholder and to
060670 - show responsibilities for this group as part of the project
060671 - organizaitonal considerations, and show assignments of their
060672 - time.
060673 -
060674 - [Did this at ref SDS 12 line 82.]
060675 -
060676 - 3. We need the COE chart of accounts for tracking costs and/or
060677 - WBS, per discussion with Tom at ref SDS 10 line 173.
060678 -
060679 - 4. WBS should use an easy to follow numbering system, ref SDS 1
060680 - line 128.
060681 -
060682 - A challenge of the numbering system is avoiding trying to make
060683 - organizational and functional assignments and focus instead on
060684 - products. The responsibility WBS can apply organizational and
060685 - functional stuff.
060686 -
060687 -
060688 -
060689 -
0607 -