DIARY: November 30, 1994 07:46 AM Wednesday;
Rod Welch
Received call from Randy on Gold Hill schedule.
1...Summary/Objective
..............
Click here to comment!
CONTACTS
0201 - PG&E Trans Sys Engineering 415 973 3877 fax 9209
020101 - Mr. Randy L Hopkins, E.E.; Engineer; Rm 580, Mail Code F5C =415 973 6757
SUBJECTS
Gold Hill Horseshoe Upgrade
Schedule & Budget, Update 941121a
Cost & Schedule Impacts
Engineering
0806 - ..
0807 - Summary/Objective
0808 -
080801 - Followed up work at ref SDS 7 line 57, work at ref SDS 6 line 64, and
080802 - at ref SDS 8 line 62.
080803 -
080804 - Will get separate comments from Buck per ref SDS 9 line 73.
080805 -
080806 - The objective is to develop realistic task scope and durations for
080807 - Engineering, including procurement.
080808 -
080809 -
080810 -
080811 -
0809 -
0810 -
0811 - Discussion
0812 -
081201 - Randy left message that he has reviewed the schedule files, ref OF 1
081202 - and ref OF 2, submitted via ref DIP 3 line 34, at ref SDS 8 lin
081203 -
081204 - He said the schedule looks okay and doable, provided there are no
081205 - scope changes, such as adding a 3rd circuit (which was considered at
081206 - ref SDS 1 line 132, but turned out not to be required in final
081207 - conceptual agreement with SMUD).
081208 -
081209 - I posted this understanding in Note 40, to reflect his review.