DIARY: November 7, 1994 11:23 AM Monday;
Rod Welch
Called Kevin re CDWR Induction Study.
1...Summary/Objective
..............
Click here to comment!
CONTACTS
0201 - PG&E Transm Contracts 415 973 3872 fax 972 0871
020101 - Mr. Kevin Coffee, E.E.
020102 - Contract Manager, Rm 2334 Mail Code B23A =415 973 3872
020103 - Transmission Contracts =415 972 0871 (fax)
0202 - PG&E Proj Mngmnt Transm Sys 415 973 6778 fax 8426
020201 - Mr. Bill DeHart, PMP
020202 - Project Manager, Room 1183B-V11C =415 973 5655 pger 510 810 3026
020203 - Project Management Group
0203 - PG&E Fresno Office 209 821 5000 fax or 800...
020301 - Mr. Jeff Little; =209 263 5241; Reg Land Department
SUBJECTS
PG&E submit induction study
941103 CDWR Induction Study meeting
Notes & Follow Up
Frequency of TL Faults
General
0707 - ..
0708 - Summary/Objective
0709 -
070901 - Followed up work at ref SDS 19 line 33. Want to review strategy
070902 - about completing the inducation study.
070903 -
070904 - Called Maria Ly to confirm understandings about the cumulative effect
070905 - of the Chalome and new transmission lines, per ref SDS 19 line 96.
070906 -
070907 - Submitted ref DIT 1 line 30 to Kevin via EM.
070908 -
070909 -
070910 -
0710 -
0711 -
0712 - 1346 called Jeff Little
0713 -
071301 - Followed up work at ref SDS 19 line 111. Jeff confirmed that the
071302 - minimum distance of the TL to the pipeline shown as 60' in figure 3.1
071303 - on page 5, is correct.
071304 -
071305 - Jeff said the easement discussions with Bob at ref SDS 5 line 460,
071306 - are generally correct, except that in doing the actual staking PG&E
071307 - found it was possible to position the line so there was a minimum of
071308 - 60' instead of 50' along the pipeline route. There are a few places
071309 - where the TL bends and so may come within 50' but it would not be
071310 - correct to use this a "minimum" since these conditions are similar to
071311 - the 5 or so places where the TL crosses the pipeline, and so in those
071312 - locations the "minimum' is 0'. PG&E was able to adopt a wider min-
071313 - imum distance from the pipeline because of wider easements provided
071314 - for pipeline appurtant facilities. He explained it helps PG&E
071315 - construction operations hold down construction costs by providing
071316 - more room for guy wires.
071317 -
071318 -
071319 -
071320 -
071321 -
0714 -
0715 -
0716 - 1421 Kevin called back
0717 -
071701 - Advised of considerations at ref SDS 19 line 33. Kevin plans to
071702 - discuss this matter further with Transmission Planning. Submitted
071703 - ref DIT 1 line 30 to Kevin, confirming understandings, with copy to
071704 - Bill.
071705 -
071706 - [Followed up again at ref SDS 20 line 56.]
071707 -
071708 -