DIARY: November 3, 1994 07:45 AM Thursday; Rod Welch

Travel to Sacramento to meet with CDWR.

1...Summary/Objective


..............
Click here to comment!

CONTACTS 
0201 - CDWR, Div Op. & Maint.             Telephone;   fax or 800...
020101 - Ms. Lori Brown, E.E.
020102 - Project Manager PG&E Contract, Coastal Branch, Phase II =916 653 9849
020103 - Power Contracts =916 653 9295 fax

SUBJECTS
941103 Sacramento CDWR, Induction Study
Travel Arrangements

0604 -    ..
0605 - Summary/Objective
0606 -
060601 - Followed up work at ref SDS 4 line 96.
060602 -
060603 - Arrived early.  Lori introduced me to her new supervisor, Mike.  She
060604 - was explaining the purpose of the meeting today, and indicated that
060605 - PG&E's study cooborated a "napkin" analysis done by Don Tribble which
060606 - showed that a 50' separation between the pipeline and the transmission
060607 - line eliminates major induction onto the pipeline (see comments at
060608 - progress meeting on Aug 18, 1994, ref SDS 1 line 821).  Mike asked if
060609 - PG&E's study was predicated on CDWR's design drawings for the pipe-
060610 - line. Lori advised these drawings were submitted to PG&E for this
060611 - purpose (see notes of meeting for Oct 5, 1994 ref SDS 3 line 655).
060612 -
060613 -
060614 -
Distribution. . . . See "CONTACTS"