1...submit revised schedule to Lori and Kevin to prepare for meeting on
2...Bill said he has mentioned to Kevin the idea of presenting to CDWR
CONTACTS
0201 - PG&E Proj Mngmnt Transm Sys 415 973 6778 fax 8426
020101 - Mr. Bill DeHart, PMP
020102 - Project Manager, Room 1183B-V11C =415 973 5655 pger 510 810 3026
020103 - Project Management Group
0202 - PG&E Building & Land Svcs. 415 973 8273 fax or 800...
020201 - Mr. Robert Masuoka; Room 2027, Mail Code H21A =415 973 8273
0203 - PG&E Trans Sys Engineering 415 973 3877 fax 9209
020301 - Mr. Jivat Gidvani, E.E.
020302 - Engineer; Rm 580, Mail Code F5C =415 973 3877
SUBJECTS
Coastal Branch Aquaduct, CDWR
Interface with CDWR Activities
Delays, General, CDWR Schedule
Construct
1006 - ..
1007 - Summary/Objective
1008 -
100801 - Followed up work at ref SDS 5 line 54. Reviewed changes needed and
100802 - procedures for review with PG&E Construction people, Bob Masuoka and
100803 - Jivat.
100804 -
100805 - It is possible on the Devils Den - Polonio Pass work, that PG&E
100806 - can perform its work once CDWR completes the switchyard.
100807 -
100808 - Bill called Jivat. Jivat seemed to indicate CDWR needs to get
100809 - further along with the plant construction than merely completing
100810 - the switchyards, in order for PG&E to commence its work.
100811 -
100812 - These will be the points that need to be addressed by CDWR.
100813 -
100814 - As a result, we decided to simply change the dates on milestons:
100815 -
100816 - DH3P Meters by CDWR
100817 - DH3R Plants Ready for Testing by CDWR
100818 -
100819 - ...these milestones were dated 4/28/95
100820 -
100821 - ...new dates will be 4/8/96
100822 -
100823 - We considered the analysis with respect to showing a link between
100824 - the task DH3R "Plants Ready for Testing, by CDWR" and other tasks
100825 - by CDWR which are shown in CDWR's schedule, per ref SDS 5 line
100826 - 103. The question is whether we want to insure that if something
100827 - in CDWR's schedule changes, then the impact on PG&E's schedule
100828 - should be automatic, otherwise it may get overlooked, particular-
100829 - ly, if the schedule originators are not around in 6 months or a
100830 - year when the work is actually being done.
100831 -
100832 -
100833 - Bill has a staff meeting until noon today. We will meet after lunch
100834 - to review changes based on discussions this morning. I will meet with
100835 - Bob Masuoka today for his input on finalizing the schedule. Will
100836 - submit revised schedule to Lori and Kevin to prepare for meeting on
100837 - Thursday with CDWR.
100838 -
100839 - We reviewed the single line electrical drawings submitted by CDWR,
100840 - from the meeting in Sacramento on Aug 18, 1994, ref SDS 1 line 594.
100841 -
100842 -
100843 -
100844 - Told Bill about settlement conference tomorrow in Belli matter at
100845 - 1000.
100846 -
100847 - [This was later cancelled due to admin error by court.]
100848 -
100849 -
1009 -
1010 -
1011 - 0936 received call from Bob
1012 -
101201 - He can meet at 1400 today. We set that.
101202 -
101203 - He is at 123 Mission on the 20th floor. He asked me to have the
101204 - guards call him.
101205 -
101206 -
1013 -
1014 -
1015 - 1004 called Jivat re ride to Los Banos
1016 -
101601 - He will meet at Daly City BART station oa 0715a.
101602 -
101603 -
1017 -
1018 -
SUBJECTS
Extend period and budget for another $10K.
1104 - Summary/Objective
1105 -
110501 - Bill said he has mentioned to Kevin the idea of presenting to CDWR
110502 - making a line item out of the SDS effort for the PG&E budget.
110503 -
110504 - They have not discussed it extensively; Bill seemed to indicate this
110505 - could be an item of discussion with Lori Brown at the meeting on the
110506 - schedule.
110507 -
110508 -
110509 -
110510 -
Distribution. . . . See "CONTACTS"