THE WELCH COMPANY
440 Davis Court #1602
San Francisco, CA 94111-2496
415 781 5700
S U M M A R Y
DIARY: September 7, 1994 11:09 AM Wednesday;
Rod Welch
Update schedule on Coastal Branch II, review with Bill.
1...Summary/Objective
..............
Click here to comment!
CONTACTS
0201 - PG&E Proj Mngmnt Transm Sys 415 973 6778 fax 8426
020101 - Mr. Bill DeHart, PMP
020102 - Senior Project Manager, Room 1183B-V11C =415 973 5655 pger 510 810 3026
020103 - Project Management Department
0202 - PG&E Building & Land Svcs. 415 223 8273 fax or 800...
020201 - Mr. Robert Masuoka; Room 2027, Mail Code H21A =415 223 8273
SUBJECTS
Coastal Branch Aquaduct, CDWR
Controls, Schedule, Interface with CDWR Activities
Pipe Manufactering
Review
Start Dates
Schedule Files
R/W Easements by CDWR
1009 - ..
1010 - Summary/Objective
1011 -
101101 - Follow up ref SDS 13 LE4G, ref SDS 7 7F8N.
101102 -
101103 - We edited Schedule file reviewed with CDWR, 940817, and created a new
101104 - one dated 940907.
101105 -
101106 - Bill and I updated the schedule, addressing the following points:
101107 -
101108 -
101109 - Why no right of way easement tasks for Casmalia as there are for Arco
101110 - Polonio Pass (task 1.1.1) and SLO Hydro (task 2.1.2)?
101111 -
101112 - Bill called Bob Masuoka.
101113 -
101114 - Bob indicated we need a new task to acquire the R/W for Casmalia.
101115 - We added the following task, and made it control Staking for
101116 - Construction, activity 3.1.9, which is a lag to Construction,
101117 - activity, 3,1.10:
101118 -
101119 - 3.1.1 Acquire R/W by CDWR review by PG&E
101120 -
101121 - Why no "Preliminary Pipeline Design by CDWR" activity for Arco -
101122 - Polonio Pass work, as there is on SLO Hydro, activity 2.1.1? Seems
101123 - like this has come up in meetings, and it is possibly more important
101124 - on Arco - Polonio than on SLO Hydro portion of the work?
101125 -
101126 - Do we need tasks for transfer trip communication line; seems like
101127 - major task CDWR must complete in advance of PG&E being able to
101128 - complete its work. Similarly for creating a control room.
101129 -
101130 - Incorporated these new tasks:
101131 -
101132 - 2.2.1.2 Obtain Lease Lines by CDWR
101133 -
101134 - 2.2.1.4 Construct Space for Comm. Control Area by CDWR
101135 -
101136 - Made this a milestone, since the duration is up to CDWR,
101137 - but we need to confirm the target finish date from CDWR,
101138 - and create a way for it to float based on actual progress
101139 - by CDWR.
101140 -
101141 - [This was discussed with CDWR on Sep 22, 1994 where PG&E
101142 - was instructed to perform without regard to completion
101143 - of CDWR work. ref SDS 16 8845
101144 -
101145 -
101146 -
101147 - Need other interfaces between CDWR schedule and PG&E Schedule, per
101148 - ref SDS 7 line 65.
101149 -
101150 - We reviewed the schedule received from Lori Brown, ref DRT 2 line
101151 - 10, per understandings at meeting in Sacramenot on Aug 18, ref
101152 - SDS 5 line 286. CDWR's schedule entitled:
101153 -
101154 - Design & Construction Schedule
101155 - dated: 940811
101156 -
101157 - ...was received via fax from Lori on 940822. The fax is hard to
101158 - read, and in any case does not seem to have sufficient detail to
101159 - determine interfaces between CDWR's work and PG&E's work.
101160 -
101161 - Bill called Lori to schedule a meeting next week with CDWR's
101162 - planning and scheduling engineer to obtain this information.
101163 - She should call back tomorrow to confirm date and time.
101164 -
101165 - [Scheduled task to follow up with Bill.]
101166 -
101167 - What is impact of pipe manufacturing delay discussed at ref SDS 3
101168 - line 75.
101169 -
101170 - We need information from CDWR to evaluate this issue. Somewhere
101171 - this may feed into PG&E's construct activities.
101172 -
101173 - [CDWR reported on pipeline construction progress at ref SDS 16
101174 - line 156.]
101175 -
101176 -
101177 -
101178 -
101179 -
1012 -
SUBJECTS
Casmalia Interchange, Land, Cadastral Survey
Schedule, Casmalia, 115 kV TL, Survey
1205 - Summary/Objective
1206 -
120601 - Received ref DRT 1 from Bob Masuoka to Jeff Little advising about
120602 - procedures for accessing property to survey Casmalia, ref DRT 2 line
120603 - 27.
120604 -
120605 - Bob advises property owners are concerned about location of the
120606 - Casmalia pumping plant, and it appears by extension the tie line.
120607 -
120608 -
120609 -
120610 -
1207 -
Distribution. . . . See "CONTACTS"