1...Sarah advised that the plant is now running at less than full capacity
CONTACTS
0201 - Department of Natural Resources 406 444 6699 fax 6721
020101 - Ms. Sarah Bond, Esquire
SUBJECTS
Speed Increaser
DNRC Legal - general
views (meetings)
Collateral Damage, General
Mitigation (Voith Instructions)
Insurance coverage
0708 - ..
0709 - Summary/Objective
0710 -
071001 - I asked Sarah about notices to DNRC insurance carrier and to
071002 - Voith regarding the collateral damage that may be occurring to the
071003 - plant as a result of running it with a defective speed increaser, per
071004 - the record on 911015. ref SDS 3 0499 and on 911010. ref SDS 1 0388
071005 -
071006 - Sarah advised that the plant is now running at less than full capacity
071007 - as a result of recommendations by Voith.
071008 -
071009 - Are such recommendations in writing so there is an effective date
071010 - of the instruction?
071011 -
071012 - It appears DNRC can establish compliance based on the record of
071013 - plant operation. At some point it should show output of power at
071014 - the capacity recommended by Voith.
071015 -
071016 - [On 911022 DNRC records show Voith has not recommended nor
071017 - instructed on plant operations. ref SDS 4 0001]
071018 -
071019 -
071020 -
071021 -
071022 -
0711 -
Distribution. . . . See "CONTACTS"