S U M M A R Y


DIARY: December 19, 89 09:38 AM .......; Rod Welch

CSCJ correspondence review and update.

1...This is to review correspondence that has accumulated the past week


..............
Click here to comment!

CONTACTS 

SUBJECTS
HPS, CSCJ Litigation
Administration, receive
documents, etc.

0406 - This is to review correspondence that has accumulated the past week
0407 - while I was in depositions in San Jose.
0408 -
0409 - Yesterday was devoted to debriefing HPS staff and reviewing exhibits
0410 - for incorporation into opinion.
0411 -
0412 -
0413 -

SUBJECTS
HPS, CSCJ Litigation, Issues
Mislocated Dowels
Errors & Omissions
Amoroso Delay impact to BBC
Architect, DHP

0808 -
0808 -    ..
0809 - Received Roy's notes of meeting with Architect, DCT 3
0810 -
081001 - Roy's notes on page under heading Contract A v B.
081002 -
081003 - HPS needs Amoroso's grid survey expert report
081004 -
081005 - HPS needs to analyse the changes approved by CSC during the job  for
081006 - which it is seeking to recover funds from DHP.
081007 -
081008 - See DCT 3 page 4 Major Issues, re PMA list.
081009 -
081010 -
081011 -

SUBJECTS
HPS, CSCJ Litigation, Issues
BBC as-planned schedule,
narrative received 891206
Schedule, Data Understanding
Pending Documents Requested
Dawson-Edwards, (BBC,
EX) 891211

1210 - Received Gordon's report, DCT 5
1211 -
121101 - This a large body of Primavera reports, plus some narrative by
121102 - Gordon explaining his understandings.  Included are some schedule
121103 - network charts, presumably generated by Primavera.
121104 -
121105 - Read Gordon's preliminary schedule report.
121106 -
121107 -
1212 -
1213 - Received HPS letter to NW re missing data, DCT 13
1214 -
121401 - This explains why the schedule data provided on disketts by NW is
121402 - inadequate to analyse the as-built schedule.
121403 -
121404 - It requests the schedule data cited by OKA contract and McFarlane
121405 - depo indicating Master schedule maintained by OKA.
121406 -
121407 - We know now the answer to question #3 on page 2, which asks if the
121408 - schedule data supplied by NW to HPs is the schedule data being
121409 - relied on by BBC and CSC to present the claims and develop CSC's
121410 - position relative thereto.
121411 -
121412 - Dawson-Edwards' depo established he did not rely on the OKA as-built
121413 - schedule.
121414 -
121415 -
1215 -
1216 - Gordon requests exhibits from Dawson-Edwards' depo  ref DCT 14
1217 -
121701 - This is a list of exhibits and other information Gordon requests
121702 - from the deposition conducted last week.
121703 -
1218 -
1219 -

SUBJECTS
HPS, CSCJ Litigation, Issues
Schedule analysis, acceleration
DHP, BBC
Precast structural concrete
Schedule approval process by OKA/BBC
Project Planning & Oversight

1809 - Received transmittal with various materials, ref DCT 6
1810 -
181001 - This has the design schedule prepared by DHP on 840127.  We should do
181002 - a study to see if the record shows any material deviations from the
181003 - portion of the schedule for which DHP was not responsbile  such as
181004 - CSC review period, increased work mandated by CSC, increased design
181005 - complexity.
181006 -
181007 -
1811 -
1812 -
1813 - Received correspondence review by Gordon, DCT 9
1814 -
181401 - This summarizes correspondence by OKA and its consultants on
181402 - schedule review and analysis based on the original bid plans.
181403 -
181404 - Contains recommendations by Proctor to mandate two cranes  and
181405 - similar acceleration measures contractors could have taken to meet
181406 - the completion date.
181407 -
181408 - Acceleration
181409 - Two cranes
181410 -
18141001 - I called and discussed this point with Gordon.  He said BBC's
18141002 - original schedule showed it intended to use two cranes.  The
18141003 - schedule shows two parallel paths for performance of construction,
18141004 - each of which required a crane.
18141005 -
18141006 - CEG's report discusses use of cranes and production by cranes
18141007 - under various configurations.  This should provide information
18141008 - from which to determine whether BBC's claim for an extra crane is
18141009 - supported.
18141010 -
18141011 - BBC makes request for a separate concrete pump truck.  Concrete
18141012 - pumping is generally more efficient means to pour than a crane and
18141013 - buckets.
18141014 -
18141015 - Did BBC make any allowance in their bid for pumping?  If so, their
18141016 - request for extra payment on this basis is unfounded  except that
18141017 - they may have needed increased pumping.
18141018 -
18141019 -
181411 -
181412 -
181413 - Schedule feasiblity
181414 -
18141401 - I suggested to Gordon that he consider whether the approved BBC
18141402 - planned schedule provided sufficient time for the finish trades.
18141403 - This is should be studied because Dawson-Edwards testified that
18141404 - BBC's schedule did not allow enough time for this work, because in
18141405 - his opinion, too much time was alloted for the earlier work.
18141406 -
18141407 -
18141408 - HPS needs to juxtapose more carefully the schedule defects cited
18141409 - by OKA's schedule expert and site consultant, Noel McFarlane,
18141410 - together with the errors HPS finds, in order to show OKA failed to
18141411 - properly manage the job to avoid delay in permitting BBC to
18141412 - proceed with defective materials under the pretense that this was
18141413 - an "...excellent tool for controlling the activities in Contract
18141414 - B."
18141415 -
18141416 -
181415 -
181416 -
1815 -
1816 -