DIARY: September 28, 1988 08:30 AM .......; Rod Welch

Worked at BPP on various matters.

1...Summary/Objective
2...Tape Record Meetings Review for Accuracy of SDS Records
3...Claim and Change Order Review with Contractor
4...Curb Ring Tolerance Dispute
5...Sletten Obstructing Work by Other Contractors
6...Gracon Barge Movement and Docking Procedures
7...Voith Contract Performance Review Based on Recent Correspondence
8...Temp Power for Dewatering Notify Contractor to Perform


..............
Click here to comment!

CONTACTS 
0201 - O-0389 0101 Tudor Engineering Company  406 266 3728     800
020101 - Mr. Jeff Ghilardi,

SUBJECTS
Meeting Notes &
Understandings, Prepare

0604 -    ..
0605 - Summary/Objective
0606 -
060601 - Follow up ref SDS 2 0000.
060602 -
060603 - Complete notes, 880928 Progress meeting, ref 2.
060604 -
060605 -
060606 -
060607 -
060608 -
0607 -
0608 -

SUBJECTS
Meeting,Procedures, Notes
& Understandings, Tapes

0905 -
090501 -  ..
090502 - Tape Record Meetings Review for Accuracy of SDS Records
090503 -
090504 - Wayne said that Sarah Bond has the tapes and the recommendation that
090505 - someone review them to see if there is anything there that requires
090506 - clarification.
090507 -
090508 -
090509 -
0906 -
0907 -

SUBJECTS
Claims & Contractor
General Administration
Review with Contractor
Pending Change Order Requests

1207 -
120701 -  ..
120702 - Claim and Change Order Review with Contractor
120703 -
120704 - On 880927 planned to meet Paul at 1400 today. ref SDS 1 F43F
120705 -
120706 - Because the weekly Progress meeting was held today and then the
120707 - meeting on Curb Ring installation, ref 2 and 3, couldn't do this
120708 - today.  Will try to do it Friday.  I will be in Helena tomorrow.
120709 -
120710 -
120711 -
120712 -
120713 -
1208 -
1209 -

SUBJECTS
Curb Ring Tolerance Dispute
Following Voith's Instructions
DNRC Legal, views General

1506 -
150601 -  ..
150602 - Curb Ring Tolerance Dispute
150603 -
150604 - Had a separate meeting on this today, see ref 3.
150605 -
150606 - Completed notes Curb Ring installation meeting, ref 3.
150607 -
150608 - Jeff requested a response to Sletten's letter on this matter dated
150609 - 880926.  Letter should consider the meeting today, ref 3.
150610 -
150611 -
150612 -
1507 -
1508 -
1509 -

SUBJECTS
Coordination with Gracon
Upstream Cofferdam Access

1705 -
170501 -  ..
170502 - Sletten Obstructing Work by Other Contractors
170503 -
170504 - Sletten has parked its crane in the position where Gracon needs to
170505 - set-up its concrete pumping truck.  Sletten was given notice during
170506 - the meeting this afternoon that it should make arrangements to avoid
170507 - causing Gracon unnecessary expense or delay in connection with this
170508 - matter. ref SDS 2 Y26M
170509 -
170510 -
170511 -
170512 -
1706 -
1707 -
1708 -

SUBJECTS
Coordination with Gracon
Gracon Barge Operation

1805 -
180501 -  ..
180502 - Gracon Barge Movement and Docking Procedures
180503 -
180504 - Submitted the letter to Jeff regarding Gracon's barge movement and
180505 - docking procedures, ref 9.
180506 -
180507 - Jeff felt it was unnecessary to submit this to Gracon.
180508 -
180509 -
180510 -
180511 -
1806 -
1807 -

SUBJECTS
Scheduling & Management
Management of Voith Contract
Interface with Sletten
General Administration

2107 -
210701 -  ..
210702 - Voith Contract Performance Review Based on Recent Correspondence
210703 -
210704 - Jeff requested a review and analysis of the Voith Contract and its
210705 - letters of September 20 & 27, to develop discussion points for
210706 - conference call this morning on Voith start schedule.
210707 -
210708 - At conclusion of teleconference, Jeff requested a paper reviewing
210709 - Voith position.
210710 -
210711 - Prepare review Voith Sep 27 letter.
210712 -
210713 -
210714 -
210715 -
210716 -
210717 -
2108 -
2109 -

SUBJECTS
Draft Tube Dispute
Defective work by Sletten
showing inexperience

2206 -
220601 - Called welder re quality of work.
220602 -
220603 - He lives at a mobile home park and doesn't have a telephone.  Left
220604 - emssage with the manager for Richard Wall to call back.
220605 -
220606 - Richard Wall, Welding Inspector to call back, 226 6758
220607 -
220608 -
220609 -
220610 -
220611 -
2207 -
2208 -

SUBJECTS
Dewatering Reliability
Standby Power System

2405 -
240501 -  ..
240502 - Temp Power for Dewatering Notify Contractor to Perform
240503 -
240504 - Norm mentioned today that the State is planning to install temporary
240505 - standby power because the Voith Contract needs reliable dewatering and
240506 - Sletten has refused to perform.
240507 -
240508 - Reviewed the State's options for directing the Engineer to notify
240509 - Sletten that failure to perform work under the contract will result in
240510 - the State hiring others to perform the work and charging Sletten's
240511 - contract for the cost, including costs for administration to award and
240512 - manage another contract, and for delay that may result, so that
240513 - Sletten has the opportunity to perform and avoid incurring extra
240514 - expense from the State hiring others to do Sletten's work.
240515 -
240516 - Norm asked me to prepare a draft notice.
240517 -
240518 -     [On 880929 prepared draft notice to the contractor. ref SDS 4 0001
240519 -
240520 -
240521 -
240522 -
240523 -
240524 -
240525 -
240526 -
240527 -
240528 -
2406 -
2407 -
Distribution. . . . See "CONTACTS"